27 May 2019

Here is the most recent photo of my addition.  I have done everything myself up to this point. 

27 March 2019

It has been a long, miserable, wet winter.  As you can now see the foundation is poured, forms are stripped and the foundation is back-filled.  It took me forever to get the floor up to grade and compacted.  

New bathroom will go here.

 I got the fill all compacted and leveled out.
 I laid down 2in rigid foam insulation too keep the floor from feeling to cold.  I hope it works.  I put grade stakes in the middle of the floor and established a wet screed.  Then I screeded from each side.  This time my screed board was only about 8' long.  It was a much better way than using a longer screed like when I poured my garage.
7 cubic yards in 1 day.  I had two helpers and myself.  It almost killed me but at the end of the day the slab is done and I am extremely satisfied by the outcome.  The only way I could have gotten a smoother finish would have been to rent one of those helicopter trowels.  The floor is going to be getting tile so the concrete finish isn't that critical.

11 January 2019

Home made Lumber forms for Concrete Foundation





I have built lumber forms for my foundation for the sunroom on the front of the house.  Since it is winter I am afraid of laying blocks in freezing temperatures and having the wet mortar freeze over night.  I decided to form this foundation and pour it when I have a few sunny days this winter.  I plan on stripping the forms and using the lumber again in my walls and roof when I frame the addition.